.

Tappan Zee Bridge Work May Cause Delays

Thruway Authority to continue deck replacement work this week.

Repair work on the Tappan Zee Bridge is slated for this week, and Thruway official said the maintenace will result in lane closures and possible delays.

Read below for a schedule; the work will be done in sequential order, is weather-dependent, and is subject to change, officials said.

Monday, March 26 through Wednesday, March 28

Work will begin at 8 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 10:30 p.m. until 6 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 9 p.m. and an additional left northbound lane at 10:30 p.m. until 6 a.m. from milepost 13.2 to milepost 16.2 also on the Tappan Zee Bridge. At least one lane southbound and one lane northbound will be opened to traffic from 8 p.m. to 6 a.m.

During Monday through Wednesday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 8 p.m. to 6 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Interchange 11.

During Monday through Wednesday night operations, due to the northbound lane closures, the entrance ramp from Broadway (southbound) in Tarrytown will also be closed from 9 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Thursday, March 29

Work will begin at 8 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 11 p.m. until 6 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 9:00 p.m. and an additional left northbound lane at 11:30 p.m. until 6 a.m. from milepost 13.2 to milepost 16.2 also on the Tappan Zee Bridge. At least one lane southbound and one lane northbound will be opened to traffic from 8 p.m. to 6 a.m.

During Thursday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 8 p.m. to 6 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Interchange 11.

During Thursday night operations, due to the northbound lane closures, the entrance ramp from Broadway (southbound) in Tarrytown will also be closed from 9 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Friday, March 30

Work will begin at 9 p.m. resulting in the closure of two left southbound lanes and an additional left southbound lane at 12 midnight until 8 a.m. from milepost 13.2 to milepost 17.9 on the Tappan Zee Bridge. In addition, this will result in the closure of one left northbound lane at 10 p.m. and an additional left northbound lane at 12 midnight until 8 a.m. from milepost 13.2 to milepost 16.2 on the Tappan Zee Bridge. At least one lane southbound and one lane northbound will be opened to traffic from 9 p.m. to 8 a.m.

During Friday night operations, due to the southbound lane closures, the southbound entrance at Interchange 10 will be closed from 9 p.m. to 8 a.m. and southbound detour route signs will be posted through Nyack for the entrance at Route 59 near Interchange 11.

During Friday night operations, due to the northbound lane closures, the entrance ramp from Broadway (southbound) in Tarrytown will also be closed from 10 p.m. until 6 a.m. All traffic will be detoured to the entrance ramp from Route 119.

Saturday, March 31 and Sunday, April 1

No work scheduled.

___

The lane closures on Monday through Friday nights are required in order for the contractor to continue with the replacement of the deck in the middle three lanes on the Tappan Zee Bridge from milepost 13.2 to milepost 17.9.

For the safety of the public and construction workers, motorists are urged to proceed with caution and obey posted work-zone speed limits.

Traffic updates will be broadcast to motorists via Variable Message Signs along the highway and by Highway Advisory Radio 530 AM in the Tappan Zee Bridge corridor, as well as 1610 AM in the Newburgh area.

The second phase of the deck replacement project is slated for completion in the winter of 2012.

Boards

More »
Got a question? Something on your mind? Talk to your community, directly.
Note Article
Just a short thought to get the word out quickly about anything in your neighborhood.
Share something with your neighbors.What's on your mind?What's on your mind?Make an announcement, speak your mind, or sell somethingPost something